Chinese medicine decoction purification workshop
2018-07-26
Workshop design
The basic requirements for the workshop design of the Chinese Herbal Pieces Factory are: according to the variety and quantity of the production pieces, the design workshop and its size. For example, the crushing workshop (room) requires a system to prepare an air conditioner with an air conditioner temperature of 23 °C ± 2 ° C and a relative humidity of 50% ± 5 %, generally in accordance with the number of air changes of 20 times / hour, the use of secondary medium efficiency filtration; the brightness of the lighting in the workshop is 100lx; the tidal volume of the washing, running, cutting and drying processes is large, to install the centrifugal fan exhaust to keep Indoor air circulation, and set up moisture-proof lamps to produce dust, in addition to the measures taken on the process equipment, the building design should strengthen the natural ventilation. The workshops that must be flushed and disinfected generally require terrazzo floor, 1.2m terrazzo wall skirt, wall, flat top The lighting distribution box and the power distribution box of the tiling workshop should be set separately.
Previous:No